Overview
A Bill of Materials (BOM) defines the components and subassemblies required to build a finished product. This article walks through creating a new BOM, capturing key fields like quantity-per, scrap, effectivity dates, and backflushing, and validating the setup with a quick test work order.
Applies to: Discrete manufacturing, standard and engineered items
Permissions: Product/Engineering or BOM Maintenance permissions
Prerequisites
- Parent (finished good) item exists in the Item Master with:
- Correct unit of measure (UOM)
- Costing method (standard/avg/actual) as appropriate
- Default warehouse/bin (if required)
- Component items exist with correct UOMs and stocking status
- Routing/operations created (if linking components to specific operations)
- If using revisions: at least one revision created (e.g., Rev A)
Steps
- Open the BOM module
- Menu path example: Production > Product Definition > Bill of Materials
- Select “New” or “Create” to start a BOM for the parent item
- Select the parent item
- Enter/lookup the finished good item number
- If using revisions, select the active revision
- Add components
- Click “Add Component”
- Enter/lookup the component item number
- Set Quantity Per (qty needed per 1 parent)
- Optional fields:
- Scrap % (planned loss; system will add this to gross requirement)
- Backflush flag (issue automatically at operation or at completion)
- Issue Method (Manual, Backflush, Pick/Issue, etc.)
- Effectivity dates (start/stop) to control when the component is valid
- Reference designators/notes if needed
- Link to Operation Sequence (if component is used at a specific step)
- Repeat for each component
- Maintain logical sequence if your system uses line order for reporting
- Save and approve
- Save the BOM
- If your workflow uses approvals or status (Draft/Released), set status to Released
- Optional: Add subassemblies (phantoms or true subs)
- For a phantom subassembly, mark the item as Phantom so its components explode at the parent level during planning
- For a true subassembly, add its own BOM and reference it in the parent BOM
- Optional: Attach documents
- Add drawings, SOPs, inspection plans, or images to the BOM or parent item
Best practices
- Keep UOM consistency (e.g., parent in EA, components in EA/LB/FT with correct conversions)
- Use effectivity dates for engineering changes rather than hard edits on release day
- Use scrap% for predictable loss, not for one-off adjustments
- Link components to operations for accurate backflush and variance analysis
Validate with a quick test
- Create a test work order for quantity 1 of the parent
- Review exploded requirements: ensure component quantities and scrap are correct
- If backflushing is enabled, complete the relevant operation and confirm component relief
- Adjust BOM if any component quantities or linkages are incorrect
FAQs
- What’s Quantity Per vs Scrap%?
- Qty Per is the net requirement; Scrap% inflates the gross planned requirement to cover expected loss.
- Phantom vs Subassembly?
- Phantom is a planning convenience that flattens into the parent; subassembly has its own WOs and WIP.